Before Tile Installation:

First, remove all furniture, electronics, and wall hangings from the rooms getting the new tile, as well as the closets in these rooms. Since tile cannot be installed over existing flooring, the old flooring will need to be pulled up, removed entirely, and properly disposed of. Now, it’s time to assess the subfloor and repair any imperfections if it’s not perfectly level. Bring the tiles into the home to acclimate before installation for at least 24 hours prior.

During Tile Installation:

When the big day comes, you need to plan to be home during installation. You need to be on hand to answer any questions that arise and designate an area for the crew to keep tools, mix grout, and cut tiles as needed. Keep all kids, pets, and family members away from the rooms receiving new tile and away from the designated work area. New tile installation can take around one to three days.

After Tile Installation:

Allow at least 24 hours for the new tile and grout to set and cure after installation, and your installer will provide the waiting period before it’s appropriate to walk on the floor. When you bring furniture back in the room, use proper moving equipment with wheels or lift entirely. Never drag furniture across your tile floors and use felt pads underneath legs to reduce impact. You can begin mopping with a gentle cleaner to clean your new tile floors.